Home
Go Green & Clean
City Officials
City Departments
Volunteer Boards
Electric Improvement Info
Documents
Employment
Ordinances
Maps
Links
Admin
City AlertDonate Today!
 
Latest News
  
Building Permit Application- Wednesday, August 29, 2007
Building Permit Application
Building Department- Tuesday, August 28, 2007
Building Department
1 of 1          Prev Next



Go Green & Clean Campaign
Building Permit Application - Wednesday, August 29, 2007 Building Home

Contact: John Irvine
Phone: 773-3072


 

City of Pierre
Building Permit Application Form

Owner: _______________________________ Day Phone _____________ Cell: ______________

Mailing Address: _______________________ City: _____________ State: _____ Zip: ________

Project Address: _________________________________________City: _______________________

 

New  ____        Remodel  ____        Maintenance ____ (i.e. roofing, siding, windows, doors, decks or porches)

 

Project Description: __________________________________________________________________

____________________________________________________________________________________

Project Cost:_______________________ Estimated start date: ______________________________
(Do not include exterior flat concrete work or lot)

Legal Description: _____________________________________________________________________

_____________________________________________________________________________________
(Include lot survey for additions or new construction)

Contractors:

Builder: _______________________________ Address: __________________________________
                   
Primary? Yes ____ No ____

Concrete: _____________________________ Address: __________________________________

Electrical: _____________________________ Address: __________________________________

Plumbing: _____________________________ Address: __________________________________

Mechanical: ____________________________ Address: __________________________________

New Residential or Commercial Building Plans:

Two (2) complete sets of Building Plans. Including: certified copy of the lot survey, site plans, footing and foundation plans, floor plans, showing all door and window locations and sizes, Smoke Detector locations if required, Exterior elevations (side views) of the structure, Typical Foundation/Wall/Roof section details (through the stairwell if there is one), Truss and Floor joist sizes and spacing. One set of plans will be stamped, approved, and returned and should remain on the job until the project is complete. The other set of plans will remain on file at the Public Works Office. Plans must be on 11x17 paper or larger using a 1/4" per ft. scale or greater.

Utility Connection Fees:

If the water and sanitary sewer need to be connected to the City’s systems, the tap fees must be paid prior to the connection being made. A 1" water tap for a typical residences is $616.00 including the 1" meter. If a paved street must be cut to install the service, there is a $10.00 per sq. ft. charge with a minimum of $400.00 for street repair. The electrical fee for a 200-amp permanent residential service installation is $510.21. A licensed electrician must certify the temporary electrical panel and turn in an affidavit. A $68.90 activation fee must be paid prior to energizing the temporary panel. All other electrical service/requirements must be discussed with the Electrical Engineer prior to any energizing being done. 
                                                              
Applicant  _____________________________  Date  ______________

© 2013 Official website of the City of Pierre  |  Contact Us  |  Security Policies        Website Design By BPro