City of Pierre
Building Permit Application Form
Owner: _______________________________ Day Phone _____________ Cell: ______________
Mailing Address: _______________________ City: _____________ State: _____ Zip: ________
Project Address: _________________________________________City: _______________________
New ____ Remodel ____ Maintenance ____ (i.e. roofing, siding, windows, doors, decks or porches)
Project Description: __________________________________________________________________
____________________________________________________________________________________
Project Cost:_______________________ Estimated start date: ______________________________
(Do not include exterior flat concrete work or lot)
Legal Description: _____________________________________________________________________
_____________________________________________________________________________________
(Include lot survey for additions or new construction)
Contractors:
Builder: _______________________________ Address: __________________________________
Primary? Yes ____ No ____
Concrete: _____________________________ Address: __________________________________
Electrical: _____________________________ Address: __________________________________
Plumbing: _____________________________ Address: __________________________________
Mechanical: ____________________________ Address: __________________________________
New Residential or Commercial Building Plans:
Two (2) complete sets of Building Plans. Including: certified copy of the lot survey, site plans, footing and foundation plans, floor plans, showing all door and window locations and sizes, Smoke Detector locations if required, Exterior elevations (side views) of the structure, Typical Foundation/Wall/Roof section details (through the stairwell if there is one), Truss and Floor joist sizes and spacing. One set of plans will be stamped, approved, and returned and should remain on the job until the project is complete. The other set of plans will remain on file at the Public Works Office. Plans must be on 11x17 paper or larger using a 1/4" per ft. scale or greater.
Utility Connection Fees:
If the water and sanitary sewer need to be connected to the City’s systems, the tap fees must be paid prior to the connection being made. A 1" water tap for a typical residences is $616.00 including the 1" meter. If a paved street must be cut to install the service, there is a $10.00 per sq. ft. charge with a minimum of $400.00 for street repair. The electrical fee for a 200-amp permanent residential service installation is $510.21. A licensed electrician must certify the temporary electrical panel and turn in an affidavit. A $68.90 activation fee must be paid prior to energizing the temporary panel. All other electrical service/requirements must be discussed with the Electrical Engineer prior to any energizing being done.
Applicant _____________________________ Date ______________